Mobile
Log In Sign Up
Home > english-chinese > "joint fissure" in Chinese

Chinese translation for "joint fissure"

节理裂缝
节理裂隙


Related Translations:
glacier fissures:  冰川裂隙
fissure bark:  片裂树皮
oblique fissure:  斜裂
cerebral fissures:  大脑沟
intraculminate fissure:  山顶内裂
sheeted fissure:  密集的席状裂隙密集裂缝
fissure observation:  裂缝观测.建筑物
horsetail fissure:  马尾状裂隙
fusiform fissure:  梭形裂缝
desiccation fissure:  干缩裂缝干缩裂隙
Example Sentences:
1.Adjustment of ore bringing down parameters in the case of ore body with joint fissures
节理裂隙发育矿体落矿参数的调整
2.When the rock mass of dam abutment is enclosed by faults , joint fissures and bedding planes , it is necessary to carry out holistic anti - slide stability analysis in order to make the abutment withstand potential slide
摘要当拱? ?肩岩体为断层、节理裂隙、层面等结构面所围成,有可能产生滑移时,就应进行整体抗滑稳定分析。
3.The foundation of baise gravity dam has bad geological phenomena such as high elastic modulus ratio , joint fissures and large faults etc . , so stability of baise gravity dam is the essential technical problem to project ' s success
百色重力坝地质条件复杂,地基岩体具有高模量比、节理裂隙发育等不良地质现象。百色重力坝的稳定性是事关工程成败的关键技术问题。
4.On this basis , visual programming technique is used and an interactive structural plane network simulation system frmod with all functions is worked out , which is simple and convenient to operate . the joint fissure distribution in ore masses at - 302m in chengchao iron mine is simulated with computer and the network graph of the joint fissure distribution arrived at
在此基础上,应用可视化编程技术,编制了功能齐全、操作简单,交互性强的结构面网络模拟系统( frmod ) ,并对程潮铁矿- 302m水平矿岩中节理裂隙分布进行计算机模拟,得出节理裂隙分布的网络图。
5.According to the geological conditions of baise project , erosive bands and joint fissures , f6 fault and grout curtain are fully simulated to establish 3d numerical model of the dam and its foundation . 3d non - linear fem is used to analyze the stress and strain and to appraise the operation state of both the dam and it ' s foundation under different operation conditions . by overloading the upstream water level and reducing rock strength parameter , the dam foundation ' s degradation process is simulated and the damage pattern and paths are determined , and finally the safety factor is determined
2 、根据百色的地形地质条件,充分模拟了蚀变带、节理裂隙、 f6断层、灌浆帷幕等,较为真实地建立了坝体与地基相互作用的整体三维数值模型;采用有限元法对坝体及坝基在不同工况下的应力应变状态开展分析,评价各工况下坝基的运行状态;而后采用超载法和综合法对大坝稳定性进行分析,模拟坝基的渐进性破坏过程,从而得到坝基在超载和强度下降过程中的破坏模式和破坏发展路径,最终确定坝基超载安全系数和综合安全系数。
6.In the meantime , a comprehensive field investigation into the structural planes of rock masses in chengchao iron mine is conducted , which , together with the application of statistic probability model and the analysis of investigation results of joint fissures , has determined the distribution function of structural plane parameters
同时,对程潮铁矿岩体结构面进行了大量的现场调查,应用统计概率模型,对节理裂隙调查结果统计分析,并得出结构面参数的分布函数。
Similar Words:
"joint filling compound" Chinese translation, "joint fin" Chinese translation, "joint financial intelligence unit" Chinese translation, "joint financing" Chinese translation, "joint fire research organization" Chinese translation, "joint fit-up" Chinese translation, "joint fitting" Chinese translation, "joint fixation apparatus" Chinese translation, "joint fixing" Chinese translation, "joint flange" Chinese translation